New Capital Water Treatment Plan

With several projects in Egypt’s New Administrative Capital underway, Misr for Engineering Works was a constituent in one of the Capital’s main water supply projects in June 2020 involving the extension of three water lines, a water pumping station, and a water station feeding the capital.

 

Mainly, the New Capital water treatment plant project also involves desalination and wastewater treatment systems to serve the plant water demand of high purity, demineralized water needed for the HRSG feed and the 3 million people who will live in the city. Additionally, city water is supplied via a pipeline to feed the water treatment system.

 

During the project, Misr for Engineering Works applied its experience to develop advanced wastewater treatment networks merged with the support of three double-girder EOTS to ensure the adequate delivery of drinking water to the New Capital.

Matrouh Water Station

In February 2018, Misr for Engineering Works efficiently participated in putting an end to the acute problem the Matrouh Governorate has been facing with regard to the shortage of drinking water, particularly during the summer season.

The Matrouh Water Station project was a water treatment plan offering desalination of seawater in coastal cities, since the cost of purifying and transporting the Nile’s water to Matrouh (which was the initial solution) is more expensive than desalination. Presently, the production volume of the desalination plant can go up to 24 thousand cubic meters per day.

For the project, Misr for Engineering Works supplied two of its 5-ton single-girder EOT and three 2-ton monorail to successfully support the establishment of desalination plants in Marsa Matrouh city. Thankfully, that ended the problem of shortage. Today, the station provides 90 thousand cubic meters per day combined and perseveres even during the peak times of the summer season. 

Al Yousr Seawater Reverse Osmosis desalination plant

In September 2016, Misr for Engineering Works successfully played a vital part in constructing the first mega SWRO of its kind in Egypt, Al Yousr SWRO. 

Al Yousr SWRO was launched by the Egyptian Government as an integrated solution for the potable water shortage crisis in the city of Hurghada. It utilizes two pass systems with a total capacity of 80000 m3/day, a capacity that’s sufficient enough to serve a population of +500,000 residents. 

Misr for Engineering Works was responsible for the successful execution of the lifting processes for the whole project. What makes our work stand out in terms of quality and speed was our 30+ meters span double girder crane in two parts connected with our own design for bolted connection. 

Beside that, we utilize our Double girder EOT with capacity up to 10 tons, our Single Girder EOT with capacity up to 5 tons, and other supporting lifting equipment that were – all together –  key factors for the project progress.

Port Said Tunnels

Port Said Tunnels are among the significant national projects facilitating the movement of containers and encouraging the establishment of factories in East Port Said. In October 2020, three tunnels were majorly underway under the Suez Canal in Port Said.

Misr for Engineering Works contributed with its 1.5 and 2-ton monorails in the drilling and construction work. With a cost exceeding 18 billion pounds for the projects, two of the tunnels are for cars, while the third tunnel is for the railway, aiming to cross trains to connect the east and west of the canal.

Greater Cairo Metro – Line 3 – Phase 4B

The Greater Cairo Metro Line 3 – Phase 4B came about as a result of the first Egyptian joint project between different contractors and constructors, among which was Misr for Engineering Works, to comprehensively benefit from the various experiences in the metro execution field.

Executed in October 2020, the project consists of six overground stations with seven bridges connecting them. Employing Misr for Engineering Works’ 10 and 15-ton double girder EOTs along with 2, 5, 6.3, and 1-ton single girder EOTs, the maintenance work of this project is the largest in Africa to date. That is all in accordance with international standards of safety, quality, and environment.

Under the supervision of the Egyptian joint venture and collaboration which Misr for Engineering Works is a member of, signaling, telecommunication, high voltage stations and electromechanical equipment are today being implemented by French subcontractors.

Zagazig’s Shed

Egypt has been relentlessly working to develop crossways, railway lengths, rails, signals, fleet of vehicles tractors, stations, close crossings to improve facilities for citizens and put an end to illegal crossroads that lead to train accidents. In January 2015, Misr for Engineering Works underwent a roads and bridges construction-related project, titled Zagazig’s Shed.

The Zagazig Shed’s project was established for storage and equipping and maintaining the new air-conditioned vehicles and storing the trains, while also being a source for workshops when needed. In its part, Misr for Engineering Works put to use its 20-ton double girder EOT and 75-ton double girder EOT.  

The Iconic Tower

In November 2019, Misr for Engineering Works inaugurated the tallest tower in Africa, coined the Iconic Tower, located in the Central Business District in the heart of Egypt’s new administrative capital. With that, the Iconic Tower subtly pulls the rug from the Carlton Center Tower, once considered the tallest tower in Africa.

The project comes in line with Egypt’s direction of making the new administrative capital a global city, boasting the most vital buildings in Africa and the Middle East. The 385 meters high Iconic Tower is considered a miracle by all engineering standards and is a symbol reflecting modern Egypt, just like the Pyramids and Sphinx symbolized ancient Egypt.

Misr for Engineering Works takes pride in being a contributing member to such world-class architecture encompassing high technologies with unprecedented implementation rates with the support of our single girder EOT handling 10 tons. That’s in addition to ensuring high levels of efficiency, adopting the latest methods and best practices, and factoring in security and safety. 

Supply & Installation of Cranes – Suez Canal Authority

With the beginning of 2020, in January, Misr for Engineering Works supplied and installed cranes for the construction of the new Suez Canal from Quantum 60 to Quantum 95 and expanded and deepened the branches of the Great Bitter Lakes by-passes and Ballah by-pass up to 37 kilometers, out of a total 72 km of project length.

The aim of the project was to create a canal parallel to the existing one to reap the maximum benefits from the present Canal and its by-passes while simultaneously doubling the longest parts of the waterway to facilitate traffics in both directions and reduce the waiting time for transiting ships and vessels.

The project is currently in the works and is set to be completed over a duration of one year, with Misr for Engineering Works bringing its 15-ton double girder EOT into effective action to maximize the competitiveness of the Suez Canal and excel its ranking and world classification due to the high safety rate achieved during transits.

Project 5000

Project 5000 is one of the largest construction projects in Egypt that Misr for Engineering Works takes pride in being part of, particularly since it’s part of Egypt’s New Administrative Capital.

Initiated in September 2020, Project 5000 aims to establish 5,000 housing units to accommodate more than 400,000 inhabitants, with the government allocating a significant investment from the state budget for the developmental and infrastructural needs of the mega-project.

To accommodate for the needs of the residents and due to the New Administrative Capital spanning over 1680,000 acres, equivalent to the size of Singapore, Misr for Engineering Works utilized five 5-ton monorails and put them into service.

City Centre Almaza

City Centre Almaza is undoubtedly one of the largest commercial centers in Egypt, recognized from the U.S. Green Building Council that promotes sustainability in building design, construction, and operation. In December 2017, Misr for Engineering Works successfully supported the 120-thousand square meters mall in building and construction works.

During the project, Misr for Engineering Works applied the latest technical solutions to enhance the design of the mall in a manner that contributes to achieving both a productive and sustainable environment.

With that, our top-notch 5-ton double girder EOT and 10-ton monorail were used to lay the foundations for the job, and we’re proud to have contributed to this highly environmental center. We’re ultimately proud that malls are undergoing such a significant transformation to focus on energy optimization.