Greater Cairo Metro – Line 3 – Phase 4B

Project Summary

The Greater Cairo Metro Line 3 – Phase 4B came about as a result of the first Egyptian joint project between different contractors and constructors, among which was Misr for Engineering Works, to comprehensively benefit from the various experiences in the metro execution field.

Executed in October 2020, the project consists of six overground stations with seven bridges connecting them. Employing Misr for Engineering Works’ 10 and 15-ton double girder EOTs along with 2, 5, 6.3, and 1-ton single girder EOTs, the maintenance work of this project is the largest in Africa to date. That is all in accordance with international standards of safety, quality, and environment.

Under the supervision of the Egyptian joint venture and collaboration which Misr for Engineering Works is a member of, signaling, telecommunication, high voltage stations and electromechanical equipment are today being implemented by French subcontractors.

Project Info

Sector:

Railways

Date excuted:

October 2020

Uniqueness:

The first Egyptian joint project to implement the third Cairo Metro Line - Phase IVB, to benefit from the experience gained in the metro field. The maintenance workshop of this project is also the largest in Africa.

Link:

Summary of Supplies

Type
Capacity
Quantity
Double Girder EOT
10 / 15 ton
2
Single Girder EOT
2 / 5 / 6.3 / 1 ton
10 / 8 / 1 / 3
Monorail
Jib Crane
Gantry Crane