Glass Factory

MISR for Engineering Works is definitely taking a great role in every essential and crucial industry, leaving a remarkable print everywhere.

No need to mention the importance of production facilities, especially the glass production as we contributed to one of its factories with the assistance of our 5 Ton GH electric wire hoist.

Stay tuned for more interesting projects to come!

Cairo Metro Line 4

What’s more significant to us other than seeing our crane operating just in front of the pyramids?

Yes, it’s true our supreme 60 (Ton) gantry crane is proudly standing high in front of one of the most iconic sightseeing spots in Egypt!

Al Hammam Water Treatment Plant

Proudly, MISR for Engineering Works has significantly taken part in launching the New Delta project, specifically the establishment of El-Hammam Water Treatment Plant with a 7,500,000 M3/day capacity.

Our superior lifting equipment has contributed in this huge venture with the following:

● 104 x Jib cranes – various capacities
● 12 x 10 Ton Single-girder cranes
● 5 x 3.2 Ton Single-girder cranes
● 1 x 16 Ton Double-girder crane

This New Delta project is aiming to provide many solutions to overpopulation and unemployment, as well as reclaiming agricultural lands and compensating the loss of overbuilding.

We’re extremely glad with this collaboration and the level of professionalism our entity provides.

Bashteel Project – Train Station

We are still at the front line of the railway industry, and we will consistently continue to serve every significant project.

MISR For Engineering Works has successfully been supplying cranes for the newly operational Bashtil Railway Train Station with its top notch products as follows:

● 2 × 75 Ton Double Girder Cranes

● 2 × 25 Ton Double Girder Cranes

● 2 × 10 Ton Double Girder Cranes

Bashtil Railway Station located in Giza is set to become a gateway to Upper Egypt, and is expected to serve up to 250,000 passengers daily.

Stay on hold, we have so much more to come!

Cairo Metro Line 3 – Phase 3 Work Shop

We are back on track, and we can’t wait to show you what we have in store!

MISR For Engineering Works always takes a great role when it comes to the railway industry, and here is our latest contribution in Cairo Metro Line 3, Phase 3B Imbaba Depot:

● 1 × 3.5 Ton Gantry crane

● 1 × 3.2 Ton Single – girder crane

● 1 × 15 Ton Single – girder crane

● 1 × 4 Ton – Monorail crane

● 1 × 5 Ton Single – girder crane

● 2 × 2 Ton Double – girder cranes

Phase 3B construction begins from KitKat Station, travels beneath Sudan Street (a new station), then passes through Imbaba to the Ring Road’s Axis, and ends at the Rod al-Farag Axis. The entire project will be 6.6 km (4.1 mil) long and include six new stations over all.

This extension will expectedly facilitate the entire transfer process.

Cairo Metro Line 3 – Phase 4b

MISR For Engineering Works has previously assisted in the upgrading of the Egyptian underground railways, and we will proudly continue its development with our full potential.

Gladly, we contributed to the establishment of Cairo Metro Line 3, Phase 4B using our 5 Ton Overhead Crane.

Overhead Crane (10/5 TON) for Railway Company

We at MISR for Engineering Works believe in the necessity of constant improvement, and one of our core priorities is to achieve excellence in every key initiative project.
With extreme pride, we announce our involvement in the upgrading of our Egyptian underground railways tractors, as we supported this evolution by supplying it with the remarkable 10/5 ton double girder overhead crane.
Egyptian Railways is the backbone of passenger transportation with 800 million passenger miles annually, and undoubtedly one of the essential pillars in the Egyptian industry.

Army Pipe Factory

Adding to our extensive portfolio of production facilities, Misr for Engineering Works is currently engaged in the establishment of a production facility for one of the top private companies for contracting and modern industries.

With the company’s specialization in executing complex projects and high-end commercial projects, we equally aligned our equipment with the company’s goals. With that being the case, we supported with the project with two of our 25-ton cranes, but we didn’t just stop at that.

Over and above that, we locally produced an exceptionally huge 40-ton, superb span 30m gantry crane for the project at our factory to cater to our clients’ aspirations rather than limiting ourselves to outsourcing a ready-made crane.

The outcome was a milestone for the company – a crane that’s capable of efficiently lifting the heaviest loads and facilitating a broad range of applications.

Private Factory for Pipes

With the unfaltering significance of pipe factories and the importance of ensuring that their production facilities are innovative and efficient, Misr for Engineering Works consistently supports the industry. In early 2020, we took part in the inception of a production facility for one of the largest contracting companies in Egypt.

Our contribution to the project came in the form of our prominent 4-ton single girder EOT with its optimized design and efficient energy consumption.