تخطى الى المحتوى

Cairo Metro Line 3 – Phase 3 Work Shop

ملخص المشروع

We are back on track, and we can’t wait to show you what we have in store!

MISR For Engineering Works always takes a great role when it comes to the railway industry, and here is our latest contribution in Cairo Metro Line 3, Phase 3B Imbaba Depot:

● 1 × 3.5 Ton Gantry crane

● 1 × 3.2 Ton Single – girder crane

● 1 × 15 Ton Single – girder crane

● 1 × 4 Ton – Monorail crane

● 1 × 5 Ton Single – girder crane

● 2 × 2 Ton Double – girder cranes

Phase 3B construction begins from KitKat Station, travels beneath Sudan Street (a new station), then passes through Imbaba to the Ring Road’s Axis, and ends at the Rod al-Farag Axis. The entire project will be 6.6 km (4.1 mil) long and include six new stations over all.

This extension will expectedly facilitate the entire transfer process.

معلومات المشروع

قطاع:

Railway

تاريخ استبعاده:

2023/2024

التفرد:

CML 3 Phase 4B consists of 6 overground stations and 7 bridges connecting them. The stations are as follows: El Nozha – Hisham Barakat – Qobaa – Omar ibn El Khatab – Haykesteb – Adly Mansour.

حلقة الوصل:

ملخص التوريدات

نوع
سعة
كمية
العارضة المزدوجة EOT
2 Ton
2
عارضة واحدة EOT
3.2, 5, 15 Ton
1, 1, 1
مونوريل
4 Ton
1
الجيب كرين
رافعة جسرية
3.5 Ton
1
arالعربية