{"id":1486,"date":"2020-12-05T12:14:21","date_gmt":"2020-12-05T10:14:21","guid":{"rendered":"https:\/\/misreng.com\/?post_type=portfolio&#038;p=1486"},"modified":"2020-12-08T05:02:17","modified_gmt":"2020-12-08T03:02:17","slug":"new-capital-water-treatment-plan","status":"publish","type":"portfolio","link":"https:\/\/misreng.com\/ar\/portfolio\/new-capital-water-treatment-plan\/","title":{"rendered":"New Capital Water Treatment Plan"},"content":{"rendered":"<p dir=\"ltr\" style=\"line-height: 1.3800000000000001; text-align: justify; margin-top: 0pt; margin-bottom: 0pt;\"><span style=\"font-size: 11pt; font-family: Arial; color: #000000; background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;\">With several projects in Egypt\u2019s New Administrative Capital underway, Misr for Engineering Works was a constituent in one of the Capital\u2019s main water supply projects in June 2020 involving the extension of three water lines, a water pumping station, and a water station feeding the capital.<\/span><\/p>\n<p dir=\"ltr\" style=\"line-height: 1.3800000000000001; text-align: justify; margin-top: 0pt; margin-bottom: 0pt;\"><span style=\"font-size: 11pt; font-family: Arial; color: #000000; background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;\">\u00a0<\/span><\/p>\n<p dir=\"ltr\" style=\"line-height: 1.3800000000000001; text-align: justify; margin-top: 0pt; margin-bottom: 0pt;\"><span style=\"font-size: 11pt; font-family: Arial; color: #000000; background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;\">Mainly, the New Capital water treatment plant project also involves desalination and wastewater treatment systems to serve the plant water demand of high purity, demineralized water needed for the HRSG feed and the 3 million people who will live in the city. Additionally, city water is supplied via a pipeline to feed the water treatment system.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p dir=\"ltr\" style=\"line-height: 1.3800000000000001; text-align: justify; margin-top: 0pt; margin-bottom: 0pt;\"><span style=\"font-size: 11pt; font-family: Arial; color: #000000; background-color: transparent; font-weight: 400; font-style: normal; font-variant: normal; text-decoration: none; vertical-align: baseline; white-space: pre-wrap;\">During the project, Misr for Engineering Works applied its experience to develop advanced wastewater treatment networks merged with the support of three double-girder EOTS to ensure the adequate delivery of drinking water to the New Capital.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With several projects in Egypt\u2019s New Administrative Capital underway, Misr for Engineering Works was a constituent in one of the Capital\u2019s main water supply projects in June 2020 involving the extension of three water lines, a water pumping station, and a water station feeding the capital. \u00a0 Mainly, the New Capital water treatment plant project [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1622,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","portfolio_category":[11],"portfolio_tag":[],"acf":[],"_links":{"self":[{"href":"https:\/\/misreng.com\/ar\/wp-json\/wp\/v2\/portfolio\/1486"}],"collection":[{"href":"https:\/\/misreng.com\/ar\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/misreng.com\/ar\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/misreng.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/misreng.com\/ar\/wp-json\/wp\/v2\/comments?post=1486"}],"version-history":[{"count":0,"href":"https:\/\/misreng.com\/ar\/wp-json\/wp\/v2\/portfolio\/1486\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/misreng.com\/ar\/wp-json\/wp\/v2\/media\/1622"}],"wp:attachment":[{"href":"https:\/\/misreng.com\/ar\/wp-json\/wp\/v2\/media?parent=1486"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/misreng.com\/ar\/wp-json\/wp\/v2\/portfolio_category?post=1486"},{"taxonomy":"portfolio_tag","embeddable":true,"href":"https:\/\/misreng.com\/ar\/wp-json\/wp\/v2\/portfolio_tag?post=1486"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}