تخطى الى المحتوى

Suez Thermal Power Plant

ملخص المشروع

Commencing in February 2016, the Suez Thermal Power Plant was among the most important energy production projects at its time. Misr for Engineering Works was responsible for the main lifting equipment required for the establishment of the thermal power plant.

The project was to include a 1 x 650 MW steam thermal power plant to be interconnected with the National Unified Power System (NUPS) through a 220 KV GIS switchyard. The power plant is presently capable of generating rated capacity by utilizing natural gas, mazout oil, or both, and the station’s arrangement includes an enclosed turbine building, an open boiler one, a control room, and all related structures and facilities.

Misr for Engineering Works was involved in the survey works, general site adjustments, construction of temporary works, feeding and drainage connections to the project, among others, where our 40-ton double girder EOT successfully increased the productivity and longevity for the project.

معلومات المشروع

قطاع:

محطات توليد الطاقة

تاريخ استبعاده:

February 2016

التفرد:

One of the most important energy production projects in Egypt.

حلقة الوصل:

ملخص التوريدات

نوع
سعة
كمية
العارضة المزدوجة EOT
40 ton
1
عارضة واحدة EOT
مونوريل
الجيب كرين
رافعة جسرية
arالعربية